1. Work is loaded on a free-wheeling monorail
trolley then moved into the blast chamber.
2. The work is rotated in the blast of two oscillating wheels which
sweep the blast side to side for quick, direct blast coverage.
3. The work is moved out along various monorail layouts to unload where
desired. |